The Development of "Jadon's" Model Railway in OO gauge |
![]() |
| Above: Considering the possible options |
![]() |
| Above: Laying the track |
![]() |
| Above: Track layed on four 4 x 2 bolt together boards |
![]() |
| Above: Thomas and Percy line up for a photo shot |
![]() |
| Above: The worst job - laying in the track bedding |
![]() |
| Above : The Tunnel end in progress, Triang Jinty and Coach provide accommodation for the workers |
![]() |
| Above : Nearing completion the Tunnel end awaits a covering, Notice the tunnel ends which have to be enlarged to take a sweeping curves |
![]() |
| Above: Stacks of paper and UPVA glue and we are ready |
![]() |
| Above: Its all set and ready for painting and scenic enhancements |
![]() |
| Above: Early Triang Jinty makes the first tunnel test run |
![]() |
| Above: Roads and Buildings in place |
![]() |
| Above: We need some grass |
![]() |
| Above: Two independent loops enable Jadon to control two trains |
![]() |
| Above: Preparing for pavements |
![]() |
| Above: Percy on and short freight |
![]() |
| Above: Driver change at local station |
![]() |
| Above: The grass is growing |
![]() |
| Above: Steaming past the water tower |
![]() |
| Above: Station View |
![]() |
| Above: This is the layout at 24 May 2008 |